Email a lo thleng ta.

13416106505@163.com

Tel 10 a ni.

+8613416106505

WhatsApp .

+8618144866248

Installation Serveice .

 

Safety ensure na tur hmunah chuan indoor playground, trampoline park leh family entertainment center-a installation process chu kan customer te tana senso tihtlem nan kan ti awlsam ang. Installation kawng hnih kan nei a. A hmasa ber chu kan company hian engineer te chu customer site ah installation atan a tir thin. A pahnihna chu customer-te’n anmahni chauha an thil siamte an install duh hunah chuan 3D installation diagram chu an hnenah kan thawn ang a, kan professional technical engineering supervisor chu customer leh an hnathawkte chu online-a installation-a an kalna tur kawng kawhhmuh turin kan ruahman ang. Square meter 150 aia sang leh meter 4-a sang project-te tan chuan kan professional technical engineer-te chu tlak theihna tur leh himna ṭha famkim a awm theih nan hmun hrang hrangah kal tir turin a rawt a ni.

indoor soft playground

 

InstalAtiion Indoor Playgrounds-a Technical lama kaihhruaina .

A) Install hmain: Hmanraw tulte buatsaih .

  1. A cutter: Post leh steel sheet chu cut rawh. Cutter chuan galvanized pipe chu 1.5-2.0mm inkar thickness hmangin a tan theih nan enfiah rawh.
  2. The driller: driller leh a chhunga pin pawh lei tur a ni. Pin hi #8mm & 10mm a ni a, hei hi tube-a hole awmte drill nan leh screw-te tan plastic part-te drill nan hman a ni.
  3. Spanner: Screw siam that nan chuan a chhung lam diameter chu 14mm &17mm a ni a, factory chuan a pe a ni.
  4. A knife: padding cut tur.

b) Installation tih dan tur .

Step1: Frame plan chhiar la, steel frame chu set up rawh .
1. A hmasa berah chuan frame plan attached angin chhiar la, frame chu pakhat hnu pakhatin set up rawh .
1.1 Upright post hmasa ber la la, plan angin clamps chu post-ah dah la, corner-ah dah rawh. Connecting pipe(standard 1.19m pipe) chu post-ah clamps hmangin dah la, screw hmangin tool hmangin fix rawh.

Ram chu base plate nei a nih chuan ke base chu upright post tawp lamah i dah hmasa tur a ni.
1.2 Upright post dang keng leh la, a connecting pipe chu a lem ang zelin upright post-ah dah la, tool by tool hmangin tight rawh.

Safety a awm theih nan upright post-a clamps te chu tight deuh la.
1.3 Rest frame chu chutiang bawk chuan install rawh .
Steel pipe thenkhat emaw a zawng zawng emaw chu factory-ah a sei zawng a inang lo thei a, chuvangin i tih tur chu pipe sei hrang hrang pakhat hnu pakhat, a tlangpuiin, pipe sei zawng inang vek, i teh theih a, a sir khatah pipe inang i dah thei a ni. tin, frame plan angin a sei zawng dik tak i hmu ang. Steel pipe sei tak tak a awm loh chuan cutting machine hmangin pipe chu nangmah ngeiin i tan ang.

Step2: Safety net chu la chhuak rawh .
Step3: Accessories inzawmkhawm .
Step4: Post cover kha install rawh.

Net kan tih zawh chuan post cover kan install tan ta a. Post cover chu seam hmangin chemte hmangin tan la, a sir dang cut emaw, i kut tan emaw fimkhur rawh. A cover chu post-ah dah la, a tul hunah hmun hrang hrangte chu cut la, a chhunga foam chu clamps-a siam that nan i tan tur a ni a, chutiang chuan a mawiin a felfai ang. Zip hmangin cover chu tight la, pipe chu pholan suh, clamp sir lehlamah zip awm tur a ni. Zip chu a tight lutuk tir suh, extra part chu vawi khat fix tawhin cut rawh. Connecting pipe te chu a inang tlangin khuh la, mahse a then hrang hrangin cut rawh. Net a awm chuan net tawp ber chu a chhungah a awm tur a ni a, chuti lo chuan a him lo va, felfai takin a awm lo.
Step5: Lei chu floor mat hmangin khuh rawh .
Step6: Platform 1000 chu install rawh.

Platform chu post-ah dah rawh. Tunah chuan square platform hnuaiah pipe 2 a awm tawh a, triangle platform hnuaiah pipe 1 a awm tawh bawk.
A hmasa berah chuan platform atang hian fastener chu thenfai la, pipe pakhat chu dah la, platform chu siamrem la, chutah chuan fastener chu platform-ah dah leh rawh. Tichuan foam hmangin platform hnuaia post te chu khuh leh rawh.
Tips lum tak tak:Engkim tihfel a nih hnuah, screw zawng zawng chu plastic cap hmanga khuh vek tur a ni tih enfiah la, a him em tih enfiah rawh.

 

installation guidance indoor playground

soft play install guidance

soft playgrounds install drawing

soft playgrounds parts install drawing